What opened
The Times of India, Metro Rail News and Mirror Now report that Gujarat Metro Rail Corporation (GMRC) announced on Friday 27 November 2026 that Metro trains would stop at the Sabarmati Railway Metro station from Saturday 28 November. The station is near Chimnabai Patel Bridge in Sabarmati. The reports say it was the one station on the Vasna APMC, Motera and Gandhinagar corridor that had not been operating, so the whole corridor now has service.
We did not find the GMRC announcement or timetable on a GMRC page. The times below are as the three reports give them.
First and last trains from Sabarmati, as reported
These are departure times from Sabarmati station, by direction.
| Towards | First train | Last train |
|---|---|---|
| APMC | 6:27 am | 11:10 pm |
| Mahatma Mandir | 6:45 am | 9:10 pm |
| GIFT City | 7:11 am | 6:32 pm |
| Koteshwar Road | not stated | 11:35 pm |
Metro Rail News shows a dash for the first train towards Koteshwar Road, and the other two reports do not give one. Treat it as not stated.
The walkway to the railway station
The Times of India and Metro Rail News say a walkway links the Metro station with the railway station and the bullet train station. Mirror Now says the Metro station connects directly to the railway terminal and has a walkway to the site of the upcoming bullet train terminal. The reports say this reduces the need for a bus or auto for the last stretch. They describe the bullet train terminal as upcoming, so do not plan on reaching a bullet train from this walkway yet.
What the reports do not say
- How long the walk to the railway station takes, or how far it is.
- The fare to or from this station.
- How often trains run between the first and last times.
- Which exit or lift to use with luggage.
Before you travel
Our own suggestions: if you are catching an early or late train, check the day's Metro timing for your direction before you leave. The last train towards GIFT City is reported at 6:32 pm and towards Mahatma Mandir at 9:10 pm, much earlier than the last towards APMC. Allow extra time for the walkway with luggage, since no walking time is given. If you plan around these times, check them again with GMRC for your travel day.
Sources
- The Times of India, Now, board Metro to Sabarmati railway station, 28 November 2026, read 28 November 2026
- Metro Rail News, Sabarmati Railway Metro Station opens, boosts Ahmedabad Metro connectivity, 28 November 2026, read 28 November 2026
- Mirror Now, Ahmedabad-Gandhinagar Metro completes network with new Sabarmati station opening, 28 November 2026, read 28 November 2026
Questions people ask at the gate
Has the Sabarmati Railway Metro station opened?
The Times of India, Metro Rail News and Mirror Now, all dated 28 November, report that trains stop there from Saturday 28 November 2026, after GMRC announced it on 27 November. We did not see the first day of service. We did not find the announcement on a GMRC page.
What are the first and last trains from Sabarmati?
As reported, from Sabarmati the first train is 6:27 am towards APMC, 6:45 am towards Mahatma Mandir and 7:11 am towards GIFT City. The last is 11:10 pm towards APMC, 11:35 pm towards Koteshwar Road, 9:10 pm towards Mahatma Mandir and 6:32 pm towards GIFT City. No first train towards Koteshwar Road is stated.
Is there a walkway from the Metro station to Sabarmati railway station?
Yes, as reported: the Times of India and Metro Rail News say a walkway links it to the railway station, and Mirror Now describes a direct connection to the railway terminal. None gives a distance or walking time.
Can I reach the bullet train from this station?
The reports call the bullet train terminal upcoming, so do not count on a connection to it yet.
Do the reports give a fare or train frequency?
No. They do not give a fare for this station or how often trains run.
Next walk starts at a new gate.
Was this helpful?
one tap, no sign-up


